Classic Constructions WHS Plan and Policy Induction

Welcome to the WHS Plan
and Policy Induction

 

You are required to read our WHS policy, to understand our objectives and to understand YOUR RESPONSIBILITIES.

Course overview

  1. YOUR RESPONSIBILITIES
  2. ADMINISTRATION AND MANAGEMENT OF WORKS
  3. HIGH RISK CONSTRUCTION WORK
  4. RISK MANAGEMENT
  5. WORKING ON SITE
  6. COMMON HAZARDS
  7. WORK BEHAVIOUR
  8. ENVIRONMENT
  9. EMERGENCY PROCEDURES
  10. NON-COMPLIANCE

All new and existing contractors and their workers will need to: -

  • Undertake a company WHS Induction Course prior to commencing work on site.
  • And from time to time attend training or information sessions organised by the company.

Please Note: Only competent safety minded employees are permitted on site.

Legal advice

  • This course does NOT replace any relevant Act/s or Regulation/s.
  • The information contained in this course should not be substituted for specific legal advice, but is provided as guidance to enable us both to manage our work health and safety (WHS) in a systematic manner.
  • Your business may need to develop additional information, which takes into account your circumstances specific to site conditions, trade interface, client requirements and your individual company policies and procedures.
  • It is condition of entry to our company sites that these safety requirements are adhered with.
  • All Acts, Regulations and Codes of Practice having jurisdiction over your work MUST be followed and adhered to at all times.
Non-adherence to company safety rules maybe a serious breach of your contract with our business and the relationship may be terminated if serious breaches are not rectified or continue.

Responsibilities

The WHS Act defines your employees and subcontractors as workers, as such it makes it impossible to dilute your work health & safety responsibilities by using subcontractors as they become your workers with this in mind we would like to remind you of our subcontracting policy, which states our company requires all workers to be inducted in to our WHS management plan for our construction sites.

Purchasing/ Procurement: (Materials Goods & Services)

It is the obligation of the Principal Contractor that all materials, equipment and plant purchased or hired must conform to the relevant WHS legislation and Australian Standards. This also applies to materials ordered directly by trades.

 

Have you understood our objectives and understood your responsibilities?

  • Yes
  • No

WHS training and qualifications (licences)

The legislation also details mandatory training and licence requirements. Classic Constructions will require all contractors to ensure they carry the following training; these include: -

  • General Construction Induction Card (Prerequisite to being allowed on a construction site)
  • NSW Contractors Licence
  • Asbestos Awareness Certificate (ACT)
  • First Aid Certificates of at least one person that will be on site
  • High Risk Licences (Where applicable)
    • Demolition
    • Asbestos
  • Relevant licences where applicable
    • Scaffolding (various)
    • Plant and Equipment Licence
    • Dogging & Rigging
    • Crane & Hoist Operation
    • Other if required

A valid licence is essential before any work is undertaken on any of our sites.

These documents will be requested prior to undertaking any work on our sites and may be requested when we or others undertake WHS audits or when investigating incidents on site.

Please note: A WorkCover Inspector may also ask for proof of competence.

Do you have a General Construction Induction Card?

  • Yes
  • No

If you DO NOT hold a current NSW Contractors licence, can you...

  • Perform works on a Classic Constructions project site, as long as you are careful
  • Not do any jobs for Classic Constructions in NSW

ADMINISTRATION AND MANAGEMENT OF WORKS.

Site Contacts

Classic Constructions' Site Supervisors are responsible for managing activites on all work sites. They provide all work directions and if a contractor is in any doubt as to what is being required, should contact the Site Supervisor responsible for that site. If for any reason you are unable to contact the Site Supervisor, pleaes leave a voice message or send an SMS. If urgent, please contact the relevant construction staff at the head office.

Key Contacts

David Ingram Construction Manager 0402 023 720
Craig Eves Site Supervisor 0423 887 012
Matt Pateman Site Supervisor 0401 293 889
Antoni Jagarinec Site Supervisor 0412 849 804
Geoff Vest Maintenance Manager 0412 730 817

 

Communications

Open lines of communication are pivotal to all operations, and as such, the following needs to apply:

  • All contractors are required to provide and keep an active mobile phone number for Classic Constructions to contact you. Note: mobile phones should only be used when safe to do so
  • Mobiles are required to have an active messaging service
  • Plan your calls to Classic Constructions staff so that a number of issues can be discussed and actioned at once. This will enable efficiency 
  • All contractors MUST have and maintain an Email address. Emails will be used to communicate important information and provide relevant documentation
  • Emails should be checked regularly

 

Do you have a valid email address?

  • Yes
  • No

Insurances

The protection of our team members is paramount and is critical for the protection of your business. Therefore its important that you have the appropriate level of insurance for your business.

As part of your registration with Risk360 Certify, you will be required to upload and keep your current insurance certificates. Ensure you have the correct level of Workers Compensation and Public Liabilty insurance and that you have a Certificate of Currency available.

Invoicing and Payment

The payment terms for your work performed will be confirmed prior to commencing any work. You will be advised of the deadlines for Invoices to be submitted to our office in order to be paid in the appropriate pay period. An invoice received after the cutoff time will not be processed until the subsequent pay period. No exceptions will be made.

All Invoices are to be properly completed in accordance with the Australian Taxation Office rules for "Tax Invoices". This includes specifying a registered ABN, Classic Constructions' address, Project address, date of invoice, the words "Tax Invoice", details of the work being claimed, and the amount requested along with the GST component.

Invoices should be submitted by emailing [email protected]

Invoices MUST be submitted with one invoice per job. Work performed on other projects should be submitted on a separate invoice.

Works MUST be completed before an invoice for that project can be submitted.

For work performed on any Classic Constructions site, a Site Specific Risk Assessment will need to be undertaken. The SSRA must be submitted along with the invoice for the work on that project.

In addition, some trades will be required to submit with their invoice appropriate specifications. They include:

  • Drainers - Works as executed drainage plan
  • Tilers - tile grout selection
  • Painters - Paint Colour selection

Work Allocation

The secret to ensure that work is undertaken on a variety of project sites is to plan ahead and that Classic Constructions and our contractor team follow the work schedule that is set. Given that we can have up to 40 projects being undertaken at the same time, the coordination of trades is challenging but achievable.

The Site Supervisor will advise contractors ahead of time of the projects which are coming up. Jobs are allocated to contractors depending on the type of project and current workload. We endeavour to make the transition from job to job as smooth as possible, however this is not always possible. An upcoming works schedule will be provided on a regular basis.

If a contractor is in any doubt as to their work schedule, or if the scheduled work cannot be met, please contact the Site Supervisor as soon as possible to make any adjustments.

Work Orders

At the commencement of the project, the Site Supervisor or Client Service manager (CSM) will issue each trade contractor with the neccessary plans and specifications and discuss the details of the job with you. You will also be provided with a Work Order that sets out the scope of works and amount to be paid for those works.

No work is to be commenced before a Work Order is issued.

All variations to the Work Order should be discussed with the Site Supervisor and a written quote for any variations to the Work Order is to be submitted to the office, and approved, prior to any work being undertaken.

At times, a contractor may be approached by a client to undertake additional work that is not included in the Work Order. Contractors are prohibited from accepting such work. Please advise your Site Supervisor if this occurs.

Provision of Construction Material and Equipment

Except in some construction trade areas, Classic Constructions will arrange to order and have delviered the necessary construction materials and equipment to site in time for incoporation into the build. Contractors will discuss and be advised by their Site Supervisor of the time and date of deliveries. It is imperative that the relevant contractor advise the Site Supervisor whether the delivery is correct. Any deficiencies must be advised to the Site Supervisor. Contractors are required to review their materials on commencement of work and guage if the materials provided are sufficient for the work. If additional materials (e.g. bricks and sand) are required, alert the Site Supervisor early as to your requirements. 

Remember that there are lead times for all material supplies.

If you are short of material and require more to be ordered by Classic Constructions, when should you advise the Site Supervisor?

  • As early as possible
  • When you have completed the job

HIGH RISK CONSTRUCTION WORK.

Safe Work Method Statements (SWMS) for high risk construction work

A SWMS is a written document that sets out the high risk construction work activities to be carried out at a workplace, the hazards and risks arising from these activities and the measures to be put in place to control the risks. Its primary purpose is to help supervisors and workers implement and monitor the control measures established at the workplace to ensure high risk construction work is carried out safely.

High Risk work includes but is not limited to the following examples: -

  • involves a risk of a person falling more than 2 metres, or
  • involves, or is likely to involve, the disturbance of asbestos, or
  • involves demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure, or
  • is carried out in or near a confined space, or
  • is carried out in or near a trench with an excavated depth greater than 1.5 metres,
  • is carried out on or near pressurised gas distribution mains or piping, or
  • is carried out on or near energised electrical installations or services, or
  • is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians, or
  • is carried out in an area at a workplace in which there is any movement of powered mobile plant.

DO NOT COMMENCE HIGH RISK WORK WITHOUT A SWMS

The SWMS must be specific to the work activity and include any hazards and the relevant controls required.

Contractors MUST ensure the following SWMS criteria are put in to place: -

  • Submit and agree the SWMS prior to commencing work at Principal Contractor site.
  • Ensure ALL employees have read, understood the SWMS
  • Follow the safe work procedures in accordance with their submitted SWMS
  • Any aspects or risks not covered in the SWMS must be included in your SSRA
  • ALL WHS compliance documentation must be forwarded in a timely manner on request; failure to supply will cause delays in processing payments & issuing work orders.

It is a WHS legal requirement that the Principal Contractor has a copy of their contractors SWMS and they agree with the content and safety outcomes required to conduct a safe build process effectively in line with their risk management processes.

Please be advised these documents should be readily available on site along with any applicable chemical Safety Data Sheets (SDS’s).

Can you commence high risk work without a SWMS?

  • Yes
  • No

Which high risk items do I need a SWMS?

  • involves a risk of a person falling more than 2 metres
  • involves, or is likely to involve, the disturbance of asbestos
  • involves demolition of an element of a structure that is load-bearing or otherwise related to the physical integrity of the structure
  • is carried out in or near a confined space
  • is carried out in or near a trench with an excavated depth greater than 1.5 metres
  • is carried out on or near pressurised gas distribution mains or piping
  • is carried out on or near energised electrical installations or services
  • is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor that is in use by traffic other than pedestrians
  • is carried out in an area at a workplace in which there is any movement of powered mobile plant

RISK MANAGEMENT.

RISK MANAGEMENT: HAZARD IDENTIFICATION, RISK ASSESSMENT AND RELEVANT CONTROLS

Typical hazards on residential construction sites can include but not limited to working at heights, working on or near mobile plant & equipment, gas and or electricity mains, trenches pits & excavations; traffic vehicle & pedestrians – overhead power lines.

All Contractors MUST apply a Duty of Care and accountability by carrying out a written Site Specific Risk Assessment (SSRA) of their workplace, prior to undertaking their work activity to identify any hazards that may affect safety on site and where necessary arrange for the appropriate safety control measures to be put in place.

  • If you require help or assistance in understanding & completing your risk assessment – contact your local site supervisor.
  • SSRA’s must also be dated & timed and a copy forwarded with your invoices.

PLEASE NOTE: IT IS A REQUIREMENT THAT ALL CONTRACTORS THAT PERFORM WORKS ON CLASSIC CONSTRUCTIONS SITES UNDERTAKE A SSRA AT THE COMMENCEMENT OF THE WORKS AND THAT A COPY IS SUBMITTED WITH THE INVOICE FOR THAT PROJECT. INVOICES WILL NOT BE PROCESSED WITHOUT A COPY OF THE SSRA BEING ATTACHED.

If serious risks are still present contact the site supervisor or business office to inform them what the issues are and await instructions before proceeding.

Please Note: -Site Supervisors & Internal / External Auditors will ask to see your SSRA to see if it has been completed correctly failure to complete an SSRA may result in a Non-Compliance Notice being issued or you may be asked to leave the site.

When should SSRA’s be completed?

  • before work starts
  • prior to sending your invoice

WHS management plan

  • All construction projects (construction work costing $250,000 or more) must have a written WHS management plan prepared by the principal contractor before work on the construction project commences.
  • A WHS management plan is a written plan that sets out the arrangements for managing some site health and safety matters. The intention of a WHS management plan is to ensure the required processes are in place to manage the risks associated with a complex construction project, as there are usually many contractors and subcontractors involved and circumstances can change quickly from day to day.

Informing people about the WHS management plan:

The principal contractor must ensure, so far as is reasonably practicable, that all persons who are to carry out construction work on the construction project are made aware of the content of the WHS management plan in respect to their work and their right to inspect the plan. The principal contractor will do this by:

  • giving subcontractors a copy of the plan with a requirement to make their workers aware of the contents of the plan that are applicable to their work, prior to commencing work on site, and checking to make sure this is done
  • displaying Site Rules and Contacts on site signage
  • providing, or making available, a Site Specific Management Plan to each subcontractor

Site Specific Management Plan:

  • Prior to commencement of work, ensure you receive and read a copy of the Site Specific Management Plan (Front Page) with your Purchase Order; review the hazards identified on this specific site.

Have you been given a copy of the principal contractor's Site Safety Management Plan?

  • Yes
  • No

WORKING ON SITE.

Site safety signage

Site safety sign which can be found on the site security fence normally at the front of the site contains valuable safety information including site safety rules, emergency contact details applicable to this site & what you need to do in the event of an emergency.

Site Safety signage is for the information of all workers on site and the local community. It is important you do not interfere, remove, cover or impair view of signage.

Pay attention to and heed all safety warning signs – they are there for your protection.

Do you know where the site emergency phone number is located?

  • Yes
  • No

Construction site security and fencing

General site access and egress shall be established in a manner that is safe and without the potential of endangering workers working on the site or the nearby public. There is an obligation to report any unauthorised entry to the Site Supervisor/ Principal Contractor.

Trades who leave gates or fencing panels open or unsecured will be back charged for the fence rectification

  • Gates are to remain closed and locked at all times as per company policy.
  • Contractors are required to check fences at all times. No fence panels are to be removed at any time without the prior approval of the Site Supervisor
  • Fencing panels if removed for access; MUST be laid flat and not in the propped up position for safety reasons and reinstated once work is complete. 
  • A Combination lock is provided on each site to secure the gates. Classic Constructions staff will advise contractors of the code. This code must not be provided to other parties, including clients.
  • It is the responsbility of the last contractor on site to lock the compound, regardless whether another trade is due on site that day. The combination lock tumblers must be rotated when leaving so the code cannot be accessed

Why is it important to secure the site security fencing at the end of each working day?

  • to prevent unauthorised access
  • not my problem

Construction Keys

Construction Keys for door locks are valuable and provide security to our homes. All contractors who require access to the project beyond the Close-Up/Lock-up stage will be issued with a Construction Key and required to sign a register. The responsibility for the key's protection is the sole responsibility of each contractor. Any lost keys must be reported immediately and a replacement will be provided at a fee to be backcharged to the contractor responsible.

Labelling of keys will create a high security risk if the key falls into the wrong hands - therefore contractors must abstain from labelling keys.

Construction keys should be labelled?

  • True
  • False

Clean Site Policy and Waste

Classic Constructions employ a Clean Site Policy on all construction sites. It is the responsibilty of all workers on site to ensure sites are kept clean from dust, debris and trash. Bin enclosures are established on each site which must be used to contain all contractors' waste. All waste generated by the contractor and sub trades must be handled and disposed of in accordance with provincial and municipal regulations. Recycling of materials is strongly encouraged.

When waste is being disposed of in the Bin enclosures, please compact the waste as much as possible to allow as much volume of waste in the bin as possible. Eg, flatten any product packaging.

Coffee cups, bottles,  and other personal waste is to be placed in the bin enclosure. Food scraps are not to be placed in the skip bins. Food scraps are to be taken with you off site at the end of the day. Under no circumstances should any scraps be left inside the home or garage.

Please note: Failure to comply with this instruction will result in an automatic fine of $100 as per the Classic Constructions Clean Site Policy Sign. These signs are displayed on site and must be adhered to.

Coffee cups and Food scraps being left inside the house or garage will attract a Clean Site fine

  • True
  • False

Personal protective equipment (PPE)

All PPE used on site MUST be appropriate to the task and must comply with the appropriate Australian Standard and should be in good condition.

When required, all workers MUST wear the necessary PPE to conform to the requirements of their Safe Work Method Statement for the work activity task to be undertaken.

Safety equipment including gloves, safety goggles, helmets and earmuffs should be available from your employer for your protection. Workers need to be trained in adequate use and maintenance of PPE.

Please note: Hi-Vis clothing and Safety footwear is mandatory on all Classic Constructions sites

When should personal protective equipment (PPE) be used?

  • as prescribed in your SWMS
  • as or when you feel it is required

UV protection (SUN SMART POLICY)

Classic Constructions promote a Sun Smart policy on all work sites. All workers should wear the appropriate UV protection, where and when required.

  • Sunscreen MUST be a ‘broad spectrum’ water resistant sunscreen with a minimum sun protective factor of (SPF) 30+
  • Sun protective work clothing should be loose fitting and long-sleeved with collars, long trousers.
  • A hat or appropriate headgear should shade your head, Face, neck and ears – Broad brimmed hats are recommended.
  • Check your skin, especially those parts most exposed to the sun. Report any skin changes to your doctor and request that they are examined.

Do not forget to hydrate yourself regularly drinking water or a suitable hydrate fluid not fizzy type drinks!

  • Maintain a good fluid intake by taking small, frequent drinks of water.

All workers should wear the appropriate UV protection, where and when required and regularly rehydrate themselves?

  • true
  • false

Site Toilets

Classic Constructions has a policy to provide each site with a Site Toilet and contractors shall ensure that it is kept clean and is used by only Classic Constructions project staff only.

It is the collective responsbility to maintain the amenities and exclude non Classic Constructions staff from using our amenities at all times.

Who is allowed to use the on site Toilet?

  • Only contractors and staff working on Classic Constructions sites
  • Anyone

Contractor Parking

Due to the lack of parking spaces available on some building sites, it is essential to maintain access and limit intrusion on neighbouring properties and protected verges. Please consult your Site Supervisor if parking is limited.

  • Contractors should NOT park on neighbouring properties or obstruct neighbouring driveways
  • Contractors should NOT park in a manner that obstructs oncoming traffic
  • Contractors are responsible for all parking fees and parking fines

Please drive carefully and thoughtfully at all times.

Can Contractors park on neighbouring properties without prior permission?

  • No
  • Yes

COMMON HAZARDS.

Electrical tools & equipment

All electrical equipment must when in use, be protected by residual current devices (RCDs). All electrical equipment must be well maintained, fully serviceable and inspected and tested at three monthly intervals by an electrician or suitably qualified person. A tagging system must be used and test results should be recorded in a register by the electrician or suitably qualified person.

All electrical extension leads shall be of heavy-duty type and not extended over 35 metres from the power source.   Power leads are not to be run over roadways; footpaths or areas where members of the public may trip.  Power on an adjacent house or block is not to be used unless express permission of the occupier is obtained.  Obtaining power without permission is theft.

All RCD protection (portable and fixed power boards) shall be tested on a 3 monthly basis and comply with the Industry Standard.

Double adaptors, domestic power boards and 3 pin plug adaptors (piggy-back) shall not be used on site. These can generally be identified by their white colour.

Portable Generators:

All generators must be fitted with RCD protection and weatherproof power outlets. Generators must only be operated in well-ventilated area.

  • Socket outlets (SO) MUST include residual current devices (RCDs) for the protection of electrical shock to all electrical devices connected to the general power outlets.
  • Electrical Power isolations E-locks, Lockout or Danger Tags are not to be removed unless authorised to do so.

How often should leads be tagged?

  • 3 monthly
  • 6 monthly
  • annually

Ladders

All ladders MUST conform to the Australian Standard and be of industrial grade and rated no less than 120kgs. Ladders should be maintained in a sound working condition.

Single or extension ladders may only be used to gain access or carry out permitted work where:

  1. The material or equipment being carried does not restrict movement or cause loss of balance;
  2. The trunk of the body remains centred on the ladder; and
  3. Equipment can be used with one hand (unless a control to prevent a fall is used).

Stepladders:

Correct selection of an appropriate type of stepladder is the key for ensuring safety during use.

  • Stepladders should only be used in the fully opened and locked position.
  • All components must be in a good serviceable working order.
  • A person’s feet should be no higher than the second tread from the top step.
  • A stepladder shall not be used near the edge of an open floor or penetration where, if the ladder toppled, a person could fall over the edge or through a penetration.

What grade of ladder should be used?

  • industrial grade - rated no less than 120kgs
  • 100kgs

Scaffolding & working at heights

Any person having to perform works at and above 2 metres MUST be supplied with a perimeter safety rail system, scaffold, or other approved fall arrest system.

  • A licensed/competent scaffolder MUST erect scaffold over 4 metres.
  • All scaffolds MUST be erected to conform to the Australian Standards and manufacturers/suppliers specifications.
  • Never remove guard-rails, planks, brick guards, handrails or Toe boards/ Kickboards for any reason. 
  • If scaffolding needs to be altered, speak to the Site Supervisor.
All scaffolding MUST be loaded as per the LOAD Specification identified on the “SCAFF-TAG” or Scaffold Access Control System (“SACS”) card located at the scaffold ladder access bay. If the scaffold is rendered UNSAFE or INCOMPLETE remove the “SCAFF-TAG” or “SACS” insert to reveal the “DO NOT USE SCAFFOLD” and contact the Site Supervisor immediately.

Only licensed / competent scaffolder should alter or adjust scaffolding?

  • true
  • false

STAIRVOID PROTECTION SYSTEM & GUARDRAILS: Altering safety systems prohibited

Stair-void Protection System & Guardrails MUST remain in place at all times when persons are working on the upper level.

At NO time is the Stair-void Protection System hatch to be left open; all components MUST be reinstated if they are removed.

If the Stair-void Protection System or any part of the Stair-void Protection System is NOT installed then no access to the 1st floor is permitted and the Site Supervisor MUST be contacted IMMEDIATELY!!

If there are issues in reinstating the stair- void system or guardrails who must you call?

  • site supervisor
  • your offsider

Working Alone: Legal Obligation to Worker

Alone or isolated workers should communicate to their nominated contact person/s as to their planned actions for the day e.g. SMS when arriving on site and when leaving.

  • We can assist you if we know where you are.
  • If you are delayed due to weather events let your family know where you are by keeping them informed.
  • Communication is important to ensure your safety on site & ensure your safe return.

Is it a legal obligation to ensure the welfare of workers?

  • yes
  • no

Excavations & Underground Services

Dial 1100 Before You Dig is the law

Ensure this information is considered in planning the work and decide on and use control measures to prevent people being exposed to the risk of death, illness or injury from coming in contact with, or damage to, the service.

Before excavation work starts, each relevant subcontractor must:

(a) Find out what underground services exist at or near the location of the excavation
(b) Obtain relevant information about the service (location, type, depth, restrictions to be followed) from the appropriate source DBYD 1100
(c) Record the information in writing
(d) Keep the information recorded until the construction work ends.

Before commencing any excavation on a residential construction site, the underground power plan in the local meter box (if applicable) must be inspected.

Excavations, Penetrations & Floor Openings - Falls

Each PCBU is responsible for ensuring any trenches or holes they create are made safe using suitable means.

  • All excavations 1.5 metre or more deep SHOULD be shored or battered.

Floor openings and excavations are to be adequately guarded or barricaded or otherwise protected to prevent someone falling.

  • If a safety barrier has to be removed for work, make sure it is replaced again before you leave the area.

Dangerous Protrusions – Impaling Aspects

Star pickets & reinforcement bars, nails or other protruding objects e.g. copper pipes etc. that protrude from surfaces should be made safe. Yellow plastic caps are not a protection for impalement, rather a visual indicator of the risk.  If there is a risk of anyone falling onto reo bar or star pickets, the area must be barricaded off. Consult your Site Supervisor if you are unsure.

Who’s responsibility is it to ensure Dial Before You Dig (DBYD) process is undertaken before digging on site?

Contractors are responsible for ensuring any trenches or holes they create are made safe using suitable means. All excavations in excess of 1 metre or more deep MUST be shored or battered. All star pickets/impaling posts MUST be covered by Yellow Caps. Floor openings and excavations are to be adequately guarded or barricaded or otherwise protected to prevent someone falling. If a barrier has to be removed for work, make sure it is replaced again before you leave the area.

  • site excavator
  • every PCBU who breaks the surface i.e. trenches & holes etc.

Workplace Hazardous Substances

All contractors MUST maintain a register of all hazardous substance that is used on site. The Register MUST contain a relevant and up to date Safety Data Sheets (SDS) for each of the hazardous substances used.

No hazardous substances are allowed to be stored on site without permission and must be removed by the trade contractor at the end of their working day. PC is to be notified what hazardous substance is on site.

Where should Safety Data Sheets (SDS) be kept?

  • on site where substance is used
  • in the office

WORK BEHAVIOUR.

Workplace bullying, harassment, violence or discrimination

Under both federal and state laws it is unlawful to discriminate against people at work or in a work related environment.  Bullying, which includes behaviour that intimidates, offends, degrades, insults or humiliates a person, whether physically or psychologically, is a form of harassment and will not be tolerated on any construction site.  Persons found to be bullying other persons will, at the discretion of the Principal Contractor, be required to leave the site.

The Principal Contractor under any circumstances will NOT tolerate “Workplace Bullying or Workplace Violence”.  If any such instances occur please contact the Site Supervisor IMMEDIATELY or telephone WHS Emergency Site Response number found on the site safety signage.

Workplace bullying, harassment, violence or discrimination – if you witness this what do you do?

  • turn a blind eye
  • report it to your site supervisor

Smoking and pets on site

Non-smoking environment

Classic Constructions sites are all non-smoking environments. There is strictly no smoking in enclosed areas. This includes the garage and the main residence.

Cigarette butts must be disposed of in the waste bin. NOT inside the house. Clean Site Policy fines will apply if this rule is not adhered to.

Pet policy

Whilst its an old tradition for contractors to bring a dog or pet on site for company, Classic Constructions' policy is that no pets are allowed on the work site. This is for the protection and safety of all on site.

Those contractors who have pets on site will be asked to remove the pet from site immediately.

Which of the following applies to Classic Constructions sites?

  • Smoking is prohibited in all enclosed areas including garage and house
  • Pets can be brought to site to keep you company
  • No pets allowed on site

Alcohol & drugs

Consumption of alcohol or the taking of illicit drugs is forbidden on all construction sites.

Anyone found to be under the influence of drugs or alcohol or considered not fit for work duties will be requested to leave site.

Persons following a prescriptive course of drugs should not operate any plant or machinery or carry out any other tasks if the side effect of the drugs impairs their judgement or ability to carry out these tasks safely.

It is important to remember that some prescription drugs can have side effects such as drowsiness. Check medicine labels for any warnings and let your supervisor know if you are taking any medication with a possible side effect.

  • If you identify any discarded hypodermic needles on site you MUST ensure they are safely disposed of and contact the Site Supervisor to report your findings.

Consumption of alcohol or the taking of illicit drugs is forbidden on all construction sites?

  • true
  • false

ENVIRONMENT.

Environmental & safety Issues

To promote good environmental practice and awareness across a site, the following are examples that can be implemented. The Principal Contractor should provide instruction and advice to all PCBU’s and workers in order to facilitate good environmental outcomes. These environmental workplace rules should apply equally to every person working on the site.

Workplace Environmental Management

  • Access to dangerous areas of the workplace shall be restricted and warning signs posted
  • Temporary lighting shall not be directed into adjacent properties
  • Clean up all wastes and place them in the dedicated bins provided
  • Roads must remain clear of mud, litter, building rubble and waste.

Hazardous Substance Spills

  • Any spills of chemical, paint or fuels must be reported immediately

Soils Stockpiles

  • Stockpiles must not be placed near stormwater drains, grates or drainage ditches
  • Batter stockpiles to 2:1 (horizontal to vertical) or less
  • Prevent flow of stormwater from stockpiles into drains with stabilisation or sediment fences.
  • Long term stockpiles must be stabilised
  • Contaminated soils must be placed in areas defined by the principal contractor

Stormwater

  • Use silt fences or other barriers to remove excess dirt/sediments from stormwater
  • Fix or replace any damaged silt fences or barriers

Waste

  • Place ALL separated clean paper, cans and bottles in dedicated recycling bins
  • Concrete wash out is not allowed on site and any residue is to be taken away by the agitator operator. Alternatively, breakdown and spread concrete into spaces where easily able to be disposed of. See Supervisor if any uncertainty
  • Waste paint (solid) paint containers, chemical containers render, render containers should be removed from the site at the end of the day.
  • Advise your site supervisor of any odorous solids/soils excavated at the workplace

Dust, Smoke and Odours

  • Keep exposed soil and roads moist so that they do not generate excessive dust
  • Do not drive vehicles on unsealed areas or off the established roads & tracks unless it is absolutely necessary
  • Park vehicles in designated areas ONLY
  • Remove excess soil from wheels and vehicle bodies before leaving the site

Noise

Maintain plant and equipment regularly and fit with manufacturers specified noise silencers. Noisy activities must be discussed and approved by Principal Contractor prior to starting activities

Radio's must also be kept at a relatively low level. In an occupied neighbourhood, such as a Knock Down Rebuild project, radio's must be kept low or turned off so to not impact on neighbours.

Chemicals Spill and Disposal

All Hazardous substances (chemical) and Dangerous Goods must NOT be stored on site

  • No smoking within 10 metres of any flammable goods/chemicals
  • DO NOT put chemicals or chemical containers in general purpose bins
  • DO NOT put chemicals in stormwater drains or the sewer
  • Immediately clean up any spills
  • Trades must notify Principal Contractor management immediately of any substantial or dangerous chemical spill.
  • Ensure clean up and disposal of Hazardous Substances are in accordance with the requirements in the MSDS’s and ensure that appropriate PPE is made available and worn.
Additional requirements such as environmental protection should be considered.

Which environmental items do I need to notify the builder of an issue?

  • hazardous substance spills
  • soils stockpiles
  • stormwater
  • waste
  • dust, smoke and odours
  • noise

EMERGENCY PROCEDURES.

EMERGENCY PROCEDURES AND FIRST AID

If an Emergency occurs on a Classic Constructions site, contact the Site Supervisor IMMEDIATELY or telephone 000 (or 112 on mobile) if it is a critical emergency.

Emergency numbers are also displayed on the Site Safety Signage located on the front site security fence.

WHEN PHONING FOR HELP SAY: -

  1. WHERE the emergency is : give the address/name of the site and details about the specifics of entry
  2. WHAT has happened : advise the exact nature of the injury
  3. WHAT is being done
  4. WHO is calling : leave a site or contact telephone number
  5. WAIT to be told what to do before hanging up

Whilst waiting for the authorities, keep calm, do not interfere with the accident scene and make sure the injured person is not moved; unless there is a risk of further injury to the patient or others. Reassure the injured person that help is on the way.

Assist the authorities to locate and access the accident site.

FIRE & EVACUATION PROCEDURE

  • If you see a fire or other emergency situation, firstly alert all persons on site by verbal warning. Then report it immediately to the Site Supervisor and others on site.
  • Assist anyone in danger if safe to do so
  • If safe to do so, extinguish fire or deal with the emergency situation
  • Move to designated assembly point on outside of the site boundary. Refer to site safety sign for emergency assembly point
  • Move quickly and carefully by closest safe exit route
  • Report the names of anyone who was on site but is not at the assembly area
  • Remain at the assembly area until instructed by Site Supervisor or emergency service worker
  • Do not re-enter the site until the "ALL CLEAR" is given by the Site Supervisor or Emergency Service authority

FIRST AID

Classic Constructions will require all contractors to maintain a sufficient First Aid kit. In addition contractors are required to have at least one employee trained in first aid who will be on site.

Also all Site Supervisors are trained in first aid and have a first aid kit at their disposal for use in the event of an incident.

In the event of a fire or evacuation what must you do?

  • alert all other contractors in the immediate area of danger
  • advise the site supervisor of the situation
  • if necessary call the relevant emergency services

ACCIDENTS, INCIDENTS & NEAR MISSES

All incidents which may have resulted in an injury should be reported to your Site Supervisor immediately who will determine whether it is a notifiable incident. The trades must cooperate with principal contractors’ representatives to ensure that the incident is properly investigated so that controls can be put in place to stop reoccurrence of an injury or incident. In the event of a Notifiable Incident serious injury or emergency, requiring urgent medical attention, ring 000 for immediate assistance.  The Site Supervisor must be notified at the earliest opportunity.

A notifiable incident means:

  • the death of a person, or
  • a serious injury or illness of a person, or
  • a dangerous incident.

Where a notifiable incident occurs in your workplace:

  • Contact the specific Site Supervisor or Classic Constructions office
  • Contact Emergency Services if required on 000 or 112 on mobiles
  • Contact WorkSafe or WorCover NSW if applicable
  • notify your insurance scheme agent within 48 hours

It is the responsbility of the contractor to complete an Incident Report Form. An incident report form is a short and brief report consisting of the basic facts known at that time; to be communicated to management and or WorkCover. Additionally, circulation of this document frees up valuable communication line/s to assist with advice and instruction during the emergency incident / situation. It also helps with the following:

  • Ensures Senior Management are notified to assist and enable relevant resources to be put in place
  • Provide initial help & assistance to ensure safety of injured persons
  • Provide support & manpower where required
  • Provide relevant advice to secure site & evidence

When an Accident, Incident or Near Miss has occurred on site, this MUST be reported immediately to the Site Supervisor. This will allow an Investigation to document all details and facts as soon as possible after the event to ensure preventative measures are put in place.

This will assist in addressing all safety aspects for the future and prevent reoccurrences.

When should incidents be reported?

  • within 24 hours
  • as soon as possible i.e. 30 minutes

NON COMPLIANCE.

SITE INSTRUCTION - NON-COMPLIANCE NOTICE

Where a matter of WHS Non-Compliance of products, materials, equipment or work practices is identified by a construction supervisor through regular Daily Site Safety Inspection procedures a Site Instruction / “Non-Compliance Notice” will be advised; detailing the area of non-compliance and corrective actions required.

Please note
Copies of these records will be kept on their contractor vendor file for future reference.

Repeat Offenders
Failure to effect an improvement after being advised, will lead to a review by the Construction Manager and/or the WHS Manager. Where a person or a sub-contractor is in continuous breach of safety or quality standards, or a Site instruction is not complied with in a pre-determined time frame, cancellation of the person or sub-contractors contract, may result.

If you receive Non-Compliance Notice or verbal warning of non-compliance what may be the consequence?

  • you may be asked to leave the site and be excluded from future works
  • you get a pat on the back and told to keep going about your work